Family Planning Welfare Center Establishment
DOI:
https://doi.org/10.62054/ijdm/0203.18Abstract
The paper employed Critical Path Method and Project Evaluation Review Technique (CPM/PERT) on the Establishment of Family Welfare Planning Center project to plan, organize, and schedule the tasks required in order to meet the project deadline. CPM and PERT are tools that project managers use to schedule, plan, and arrange tasks for any project. The tactics help managers identify the resources required at various times and what additional resources are required, as well as evaluating the impact of certain activity delays. They also help define occupations and activities and their start and end periods. It also aids in estimating when the job should be finished. The purpose of the paper is employ and apply PERT in the Establishment of family planning welfare center. The results show that building a family welfare center would take 412 weeks, which is five weeks longer than expected. This project is the first of its type to build a family welfare center using CPM/PERT methodologies.
References
Anderson, D. R., Sweeney, D. and Williams, T. A. (2013). An Introduction to Management Science:Quantitative Approaches to Decision Making. 13th Edition. Mason, Ohio, U. S. A.: Thomson South-Western,5191 Natrp Boulevard.
Bagshaw, K. (2021). PERT and CPM in Project Management with Practical Examples. American Journal of Operations Research. 11(1): 215 – 226.
Bluman, A. (2009). Elementary Statistics: A Step by Step Approach. 7th Edition. 1221 Avenue of the Americas, New York: McGraw-Hill Companies, Inc.
Iheonu, N. and Achom, U. (2023). Project Planning Application to Juice Production Using PERT/CPM Technique: A Case Study. Asian Journal of Probability and Statistics. 24(2): 39 – 51. https://DOI: 10.9734/AJPAS/2023/v24i2522.
Jain, S. (2013). Application of PERT technique in health programme monitoring and control. International Journal of research in commerce, IT & Management. 3(4): 63 – 69
Mood, A., Boes, D. and Graybills, F. (1974). Introduction to the Theory of Statistics. 3rd Edition. New York, Eighth Avenue, NY 10018 USA: McGraw-Hill College, New York.
Muhammet, G., Gneri, A. and Koyucan, G. (2017). Project Management in Healthcare: A case study for patient flow evaluation in an emer14 gency room using fuzzy cpm and fuzzy PERT. Sigma Journal Engineering and Natural Science. 8(1): 41–51. https://DOI: 10.52589/IJMCEGCEQS8DC.
Oladimeji, O., Akomolafe, M., Lasisi, T., Oloja, O. and Oladimeji, L. (2023). Network Analysis on Phase 1B Building of the University Health Centre, FUTA, using Critical Path Method (CPM) and Program Evaluation Review Technique (PERT). International Journal of Mechanical and Civil Engineering. 6(1): 40–52. https://DOI: 10.52589/IJMCE-GCEQS8DC.
Taha, H. (2017). Operations Research an Introduction. 10th Edition. Upper Saddle River New Jessey: Pearson Education Limited.
Winston, W. (2004). Operations Research APPLICATIONS AND ALGORITHMS. 4th Edition. Brooks/ColeThomson Learning 10 Davis Drive Belmont, CA 94002 USA: Curt Hinrichs.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 International Journal of Development Mathematics (IJDM)

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors are solely responsible for obtaining permission to reproduce any copyrighted material contained in the manuscript as submitted. Any instance of possible prior publication in any form must be disclosed at the time the manuscript is submitted and a
copy or link to the publication must be provided.
The Journal articles are open access and are distributed under the terms of the Creative
Commons Attribution-NonCommercial-NoDerivs 4.0 IGO License, which permits use,
distribution, and reproduction in any medium, provided the original work is properly cited.
No modifications or commercial use of the articles are permitted.




